What does extension of time mean?
In civil engineering & construction, extension of time means extra time added to the contract completion date because of delays the contractor is not responsible for, such as client changes or exceptional weather.
Civil Engineering & Construction vocabulary · Contracts and Payments
In Turkish: süre uzatımı, ek süre
Type at least 2 characters to search all fields.
How it is used
Abbreviated EOT. The contractor submits an EOT claim with evidence, often a delay analysis of the programme. If it is granted, the contractor is protected from delay damages for that period.
Example sentences
We've claimed a six-week extension of time because of the late design changes.
The engineer granted an extension of time for the flooding in January.
Common collocations
- claim an extension of time
- grant an extension of time
- EOT claim
- delay analysis