Civil Engineering & Construction vocabulary · Contracts and Payments

Defects liability period

Meaning in civil engineering & construction, with examples

nounAdvanced term

In civil engineering & construction, defects liability period means: A set period after completion, often 12 months, during which the contractor must come back and repair any defects in the work at its own cost.

In Turkish: kusur sorumluluk süresi, garanti süresi

How it is used

Abbreviated DLP. At the end of it the remaining retention is released and the works are finally accepted. In FIDIC contracts the same idea is called the Defects Notification Period.

Example sentences

  1. The roof leak appeared during the defects liability period, so the contractor fixed it free of charge.

  2. The defects liability period ends in March, so let's do a final inspection in February.

Common collocations

  • during the defects liability period
  • end of the defects period
  • make good defects
  • defects notification period

More terms: Contracts and Payments