Value-added
Meaning in industrial engineering & manufacturing, with examples
In industrial engineering & manufacturing, value-added means: Describing an activity that changes a product in a way the customer is willing to pay for, such as machining, assembling or painting it.
In Turkish: katma değerli, değer katan
How it is used
Used in lean analysis to sort activities into value-added, non-value-added (pure waste) and necessary non-value-added (such as legally required checks). Teams calculate value-added time as a share of total lead time, which is often only a few percent.
Example sentences
Only 6 minutes of the 4-hour process are value-added; the rest is moving and waiting.
Inspection is not a value-added step, but the customer requires it for now.
Common collocations
- value-added time
- value-added activity
- non-value-added
- value-added ratio
Related terms
More terms: Lean Manufacturing
Practise with graded reading
Reading at the right level is the fastest way to make new words stick. Pick free English books by level:
