PDCA cycle
Meaning in industrial engineering & manufacturing, with examples
In industrial engineering & manufacturing, PDCA cycle means: A four-step improvement loop: Plan a change, Do it on a small scale, Check the results, then Act by making it standard or trying again.
In Turkish: PUKÖ döngüsü, Planla-Uygula-Kontrol Et-Önlem Al döngüsü, Deming döngüsü
How it is used
Also called the Deming cycle or Shewhart cycle. It is the logic behind ISO management system standards and many improvement methods. People talk about going around the PDCA cycle and closing the loop. A version with Study instead of Check (PDSA) is also used.
Example sentences
We're in the Check step of the PDCA cycle: the new settings have run for two weeks.
Every improvement on the board follows the PDCA cycle, and the color shows which step it is in.
Common collocations
- PDCA approach
- go around the PDCA cycle
- Plan-Do-Check-Act
- close the loop
Related terms
More terms: Process Improvement
Practise with graded reading
Reading at the right level is the fastest way to make new words stick. Pick free English books by level:
