Industrial Engineering & Manufacturing vocabulary · Production Planning and Control

MRP

Meaning in industrial engineering & manufacturing, with examples

abbreviationCore term

In industrial engineering & manufacturing, MRP means: Short for material requirements planning: a method, usually run in software, that uses the production plan, bill of materials and stock levels to work out what to buy or make and when.

In Turkish: malzeme ihtiyaç planlaması, MİP

How it is used

Planners run MRP, often overnight, and act on the planned orders and messages it creates. MRP II (manufacturing resource planning) later added capacity and finance and grew into ERP. Wrong master data, such as an old BOM or lead time, gives wrong MRP results.

Example sentences

  1. MRP suggests ordering 5,000 brackets, but half of them are already in the warehouse, so the stock data must be wrong.

  2. We run MRP every night, so check the planned orders first thing in the morning.

Common collocations

  • run MRP
  • MRP system
  • MRP run
  • MRP planned orders

This word in other fields

The same English word can have a different meaning in another field:

More terms: Production Planning and Control

Practise with graded reading

Reading at the right level is the fastest way to make new words stick. Pick free English books by level: