Civil Engineering & Construction vocabulary · Site Safety

Risk assessment

Meaning in civil engineering & construction, with examples

nounCore term

In civil engineering & construction, risk assessment means: A careful review of a task or work area to identify hazards, judge how likely and how serious harm could be, and decide on control measures; also the document that records this.

In Turkish: risk değerlendirmesi

How it is used

Required before most site activities. Risk assessments are carried out, written, reviewed and signed, and workers are briefed on them. They are often submitted together with a method statement as RAMS.

Example sentences

  1. The risk assessment for the roof work doesn't cover the fragile skylights.

  2. We have to update the risk assessment now that the crane position has changed.

Common collocations

  • carry out a risk assessment
  • task risk assessment
  • review the risk assessment
  • control measures
  • RAMS

This word in other fields

The same English word can have a different meaning in another field:

More terms: Site Safety

Practise with graded reading

Reading at the right level is the fastest way to make new words stick. Pick free English books by level: