What does work breakdown structure mean?

In project management, work breakdown structure means a tree-like breakdown of all the work in a project, from the main deliverables down to small work packages that can be estimated, assigned and tracked.

ˌwɜːrk ˈbreɪkdaʊn ˌstrʌktʃərnounCommon term

Project Management vocabulary · Scope & Requirements

In Turkish: iş kırılım yapısı, İKY, iş dağılım yapısı

How it is used

Usually shortened to WBS (said letter by letter). It is created in the planning phase and is the basis for the schedule, cost estimates and responsibilities. People create, build or break down the WBS.

Example sentences

  1. Let's finish the work breakdown structure first; then we can estimate each work package.

  2. Training wasn't in the work breakdown structure, so nobody had planned time for it.

Common collocations

  • create a work breakdown structure
  • WBS element
  • work package
  • level of the WBS