Work breakdown structure
Meaning in project management, with examples
In project management, work breakdown structure means: A tree-like breakdown of all the work in a project, from the main deliverables down to small work packages that can be estimated, assigned and tracked.
In Turkish: iş kırılım yapısı, İKY, iş dağılım yapısı
How it is used
Usually shortened to WBS (said letter by letter). It is created in the planning phase and is the basis for the schedule, cost estimates and responsibilities. People create, build or break down the WBS.
Example sentences
Let's finish the work breakdown structure first; then we can estimate each work package.
Training wasn't in the work breakdown structure, so nobody had planned time for it.
Common collocations
- create a work breakdown structure
- WBS element
- work package
- level of the WBS